The entrance to the buidling                                                                                                      
IMG 3118  
    The main building from the field 
IMG 3119 
   The Dressing Rooms from the field and a stairway to "Drummers Deck"
IMG 3121
 The equipment room ($1,000,000.00 worth of Equipment)                
 IMG 3124  
    One of the dressing rooms (sponsors on the walls)   
 IMG 3125
      Front entrance with the "Kramer wall of honor" 
 kramer wall
        Classroom                                                                                    
IMG 3128 
         Redhead Equipment Board Room
 IMG 3130  

A look at the field from the building with the new logo being installed.

IMG 7104